Bulimba Bathroom Renovation 2

We began this bathroom makeover by fully demolishing the existing space right back to the studs, including removal of flooring to reach the sewer system below. Damaged and rotted timber from water leaks around the old bath and shower was replaced to restore structural integrity. We then reworked the layout by removing the bath to…

Bulimba Bathroom Renovation 1

This bathroom renovation involved a complete strip-out back to the original timber framing, allowing us to inspect and upgrade all structural elements. We removed the floor to access and reconfigure the sewer pipes and replaced any rotted timber caused by previous leaks around the bath and shower area. By removing the old bathtub, we were…