This bathroom renovation involved a complete strip-out back to the original timber framing, allowing us to inspect and upgrade all structural elements. We removed the floor to access and reconfigure the sewer pipes and replaced any rotted timber caused by previous leaks around the bath and shower area. By removing the old bathtub, we were able to open up the space and install a larger, more functional shower.

The design features floor-to-ceiling wall tiling, along with porcelain and ceramic tiles laid throughout. A frameless glass shower screen was fitted for a sleek, modern finish, and the vanity area includes 2Pac cabinetry paired with stone benchtops. This project was completed over a 4–6 week timeframe.